PlanMateAPS customizes solutions according to customer needs

PlanMateAPSCustomize production scheduling solutions according to customer needs, taking into account customer budgets, and provide different versions for large enterprises and small and medium-sized enterprises

  • PlanMate’s general solutions in various industries can solve most of the needs of customers, and the special needs of individual enterprises. Through flexible modeling methods and external plug-ins (PlugIn) for data preprocessing, most problems can be solved.
  • In addition to the software technology itself, we help customers improve work processes, control key points, implement system self-checking and foolproofing, permission control, and record key operations throughout the process to avoid manual errors caused by irregular operations.
  • Plans are designed with the client’s budget in mind. Due to the high cost of secondary development, small and medium-sized enterprises avoid secondary development and shorten the time spent in the factory to reduce costs.
  • Large enterprises have a lot of equipment. If the standard functions of the system cannot fully meet the needs, customized development methods are supported.
project Large Enterprise Edition (Advanced) Small Business Edition (Standard)
Database model storage

SQL Server 或Oracla

Yes Yes
The modeler maintains the model and Excel imports and exports the model. Yes Yes
Automatic scheduling Yes Yes
Graphical user interface, manual modification of plan, analysis view Yes Yes
ERP interface reads orders, inventory, and material lists Secondary development of interfaces and interactive data acquisition is possible as needed. Read orders from Excel

Or simple ERP view reading.

Secondary development interface is not supported (or fees will be charged separately)

MES interface Support MES interface integrated development, Web Service method Read progress reports from text, or complete tasks manually
Long-term capacity analysis and order delivery review Yes None (or additional charges apply)
Secondary development Support secondary development if necessary not support

Can use manual modification to make individual adjustments

Scheduling by material inventory constraints Yes None (or additional charges apply)
Material Requirements Planning (MRP) Yes Yes
Number of processes No limit < 5
Multi-user scheduling, multi-plan collaboration Yes 单用户
Excel production report Yes Yes
Implementation Full-time resident in the factory Data preparation and training remotely

Residing in the factory during the launch period

implementation cycle 3-6 months 1-3months